EV charger rough-in: planning the circuit and the load before the plaster goes on
The cheapest time to work out where an EV charger goes, and whether the supply can carry it, is before the walls are sheeted. Retro-fitting the circuit later costs more, and often ends in a switchboard upgrade that was avoidable at design stage.
11 min read
Topic
Switchboard
Articles and news about Switchboard for Australian builders.
EV charger rough-in: planning the circuit and the load before the plaster goes on
The cheapest time to work out where an EV charger goes, and whether the supply can carry it, is before the walls are sheeted. Retro-fitting the circuit later costs more, and often ends in a switchboard upgrade that was avoidable at design stage.
11 min read