Skip to content
  • NSW-first CPD, built by a practising builder
  • Instant PDF certificates
  • Unlimited assessment attempts
  • 12 points a year, sorted
  • 15% off your first order — get your code
  • Content aligned to the NCC 2022

Business and Contracts

Hiring your first employee in a building business

The first non-apprentice hire is the point where a building business stops being you and a ute. It changes your insurance, your record keeping, your supervision load and your cash flow before the new person has set foot on site.

Illustration for an article on hiring first employee building business

Key takeaways

  • The first non-apprentice hire triggers obligations that an apprentice hire does not, because you are adding a person who is expected to work unsupervised from the start.
  • Workers compensation, public liability and any income protection arrangements must be in place and confirmed with the insurer before the new employee starts, not after.
  • Payroll records, tax file declarations, superannuation and wage records sit alongside your existing project records, and the Australian Taxation Office expects them to be kept and produced on request.
  • Adding a wage converts a variable cost into a fixed one, so the hire has to be priced into your margins from the first week rather than absorbed as an overhead.
  • The tools, access credentials and site data the new employee touches widen your cyber exposure, so you need basic controls on devices and accounts before day one.

An apprentice hire and a first non-apprentice hire look similar on paper: one more person on the books, one more set of paperwork. They are not the same decision. An apprentice is a training arrangement with its own support structures and its own expectations about supervision. A first non-apprentice employee — a leading hand, a second carpenter, an office administrator, a estimator — is a person you are putting to work on the assumption they can carry a task from start to finish with less of your attention than an apprentice needs.

That shift is what makes the first hire different. It is not just a wage. It is a change to how your business is insured, how it keeps records, how it supervises work, how it prices jobs and how it protects the information it holds. Get the sequencing wrong and the cost surfaces months later, usually at the worst possible moment: a claim, an audit, or a job where the margin has quietly disappeared.

This article deals with the first non-apprentice hire. If you are taking on an apprentice, the incentives and the training arrangements are a separate subject and worth reading separately.

Why the first non-apprentice hire is a different decision

When you work alone or with subbies, your cost base flexes with the work. A quiet month means fewer subbie days, less materials, less fuel. The business absorbs the slowdown because the cost was never fixed.

A wage is fixed. It is payable whether the job is running, whether the client has paid, whether the weather has stopped the programme. That single change is what turns a first hire from an operational decision into a commercial one. You are not just buying capacity; you are committing to a cost that has to be recovered across every job you run from that point.

The practical consequence is that the hire has to be priced in before it happens. If you add the wage and then hope the margin absorbs it, the margin will not absorb it. The wage will be paid out of the margin and the business will feel busier and poorer at the same time.

Sequencing a first non-apprentice hire

  1. Decide the roleWrite down what the person will actually do each day, and whether that work is currently being done by you or by a subbie.
  2. Model the costWork the wage, superannuation, insurances, vehicle, tools and phone through your current pricing before you advertise.
  3. Confirm coverSpeak to your insurer and your workers compensation arrangement about the start date for the new employee.
  4. Set up the paperworkTax file declaration, superannuation choice, employment records and a written agreement before the first day.
  5. Prepare the siteInduction, access, credentials, tools and a named person responsible for the new employee on site.

Insurance and cover before the start date

The most common first-hire mistake is treating insurance as an administrative task to be sorted out in the first week. It is not. Cover needs to be in place from the day the person starts, because an incident on day one is still an incident.

Workers compensation is the first item. In New South Wales, if you employ someone, you generally need a workers compensation policy that covers that employment. The policy has to reflect the new employee and the work they will do. If you are already covered for yourself as a sole trader or through a company arrangement, that is not automatically the same as covering an employee. Confirm the position with your insurer or your workers compensation advisor before the start date, and get the confirmation in writing.

Public liability is the second item. Your existing policy may have been written around the work you do personally. Bringing an employee into the business can change what the insurer wants to know: what work they will perform, whether they will drive a company vehicle, whether they will supervise subbies, and whether they will work on sites where you are not present. Answer those questions honestly. An undisclosed change in the business is exactly the kind of thing that causes a claim to be disputed later.

If you have income protection or a business expense policy covering you personally, check whether it needs to be reviewed as well. The business now has an ongoing wage commitment that continues if you are off work, and that changes the risk profile.

The mistake that costs the most. Starting an employee before workers compensation and public liability cover are confirmed for that employment. If an injury or a damage claim arises in the gap, the business can be carrying the cost directly, and the amount involved is usually far more than the premium would have been.

Records you now have to keep

Employment adds a second category of record keeping on top of your project records. You already keep quotes, contracts, variations, invoices, receipts and site documentation. You now also keep wage records, tax file declarations, superannuation records, leave records and the employment agreement itself.

The Australian Taxation Office is clear that business records need to be kept and produced when asked, and that includes records relating to employees. The practical approach is not to build a separate system; it is to extend the one you already have. If your bookkeeping already captures job costs against a job number, add a wage category that can be coded to a job or to overhead, so you can see what a job actually cost rather than guessing.

There is a second reason to get this right early. Once you have one employee, you will almost certainly have two, and the record keeping that felt manageable for one person becomes unmanageable for three if it was never structured. Setting up the categories, the pay cycle and the filing convention at the first hire is far cheaper than rebuilding it at the fourth.

If your current setup is a shoebox and a spreadsheet, the first hire is the moment to fix it. The article on bookkeeping systems for builders covers what a workable structure looks like.

Checks before the first day

  • Workers compensation cover confirmed for the new employee from the start date.
  • Public liability and any other policies checked against the new work the employee will do.
  • Written employment agreement signed, including the duties and the reporting line.
  • Tax file declaration and superannuation choice forms completed and filed.
  • Payroll and wage records set up so each pay period is recorded as it happens.
  • Tools, vehicle, phone and access credentials allocated and recorded against the employee.
  • Site induction arranged and a supervisor named for the first weeks.

What the hire does to your pricing and margin

Adding a fixed cost changes the break-even point on every job. Before the hire, a job priced at a certain margin was profitable. After the hire, the same job at the same price has to carry a share of the wage before it contributes anything.

There are two ways builders get this wrong. The first is to treat the wage as an overhead that gets absorbed somewhere. It does not get absorbed; it gets paid. The second is to assume the new person will immediately generate enough additional work to cover themselves. That is sometimes true, but it is not a plan. It is a hope with a start date.

The disciplined approach is to work out, before advertising, what the employee needs to produce each week to cover their cost and contribute. That number then goes into your pricing. If the number is not achievable at your current rates, the hire is not the problem — the rates are. The article on pricing and margin for residential builders works through how to test that.

It also helps to be honest about the ramp. A new employee is not at full productivity in week one. They are learning your systems, your suppliers, your clients and your standards. Budget for that ramp rather than pretending it does not exist, and you will avoid the common pattern where a builder panics in month two and starts discounting to keep the work coming in.

Supervision, induction and site obligations

If you are the principal contractor on a site, bringing an employee onto that site does not reduce your obligations. It adds to them. The person needs to be inducted, needs to understand the site rules, and needs to know who to go to when something is unclear.

This is where the difference between an apprentice and a general employee shows up most clearly. An apprentice is typically attached to a tradesperson and supervised closely by design. A general employee may be expected to work on their own within a defined scope. If you have not defined that scope, you have created a situation where the person makes decisions you would have made differently, on a job you are responsible for.

The fix is a written scope of duties in the employment agreement and a clear reporting line on site. Who checks their work? Who signs off a set-out before the pour? Who do they call if the client asks for a change? These are not HR formalities; they are the controls that keep the job buildable. A change the client requests verbally and the employee acts on is a variation you may never get paid for.

If the employee will be driving a company vehicle, operating plant or working at heights, the relevant licences, tickets and inductions need to be current and recorded. Keep copies. When something goes wrong, the first question asked is what the person was qualified and authorised to do.

The cyber and information side of a first hire

The Australian Signals Directorate publishes guidance for small business on cyber security because small businesses are targeted precisely because their controls are thin. A first hire widens your exposure in ways that are easy to overlook.

The new employee will have a phone, possibly a laptop, access to your email, access to your job files, and access to your accounting or project management system. They will also have credentials. If those credentials are shared with you, or if the person uses the same password across personal and work accounts, a compromise on a personal account can reach your business records.

Basic controls are enough at this scale: separate accounts for each person rather than shared logins, multi-factor authentication on email and on anything that touches money, devices with a screen lock and automatic updates, and a clear rule about what client information can leave the office and how. When someone leaves, you need to be able to disable their access quickly, which is only possible if their access was individual in the first place.

There is also a records dimension. Client plans, contracts, variations and personal information are business records. They need to be stored somewhere you control, backed up, and not sitting only on an employee’s personal phone.

The first non-apprentice hire is the point where a building business gains capacity but takes on a fixed cost, a supervision obligation and a set of records it did not previously keep.

A worked example

A builder in western Sydney runs a small residential business doing renovations and extensions, working with a regular set of subbies and doing the carpentry personally. The workload has grown to the point where quoting happens at night and site supervision is squeezed between tasks.

The builder decides to hire a leading hand. The reasoning is sound: someone to run the day-to-day on one job while the builder quotes and manages the next. Before advertising, the builder writes down what the leading hand will actually do, and discovers that a meaningful part of the role is coordinating subbies and dealing with clients on site. That is a supervisory role, not a second pair of hands, and it needs to be priced and insured accordingly.

The builder then models the cost. The wage, superannuation, a vehicle allowance, a phone, tools and the additional insurance are added up and divided across the jobs the business expects to run in the year. The result shows that the current rates on renovation work will not carry the hire unless the business also takes on a larger job each quarter. That is uncomfortable, but it is better discovered before the hire than after.

Cover is confirmed with the insurer and the workers compensation position is checked and documented before the start date. The employment agreement sets out the duties, the reporting line and the authority to approve variations — the leading hand can note a client request but cannot agree a price. A separate login is created for the project management system, multi-factor authentication is switched on, and the leading hand is issued a work phone rather than using a personal one for client photos and messages.

Six months in, the business is running two jobs at once. The margin on each job is thinner than it was when the builder worked alone, because the wage is now in the cost. But the number of jobs has increased and the builder is no longer quoting at midnight. The hire worked because it was priced, insured and scoped before it happened, not because the builder got lucky.

Keeping your own knowledge current

Hiring is a business change, and business changes sit alongside the technical and compliance knowledge you already maintain. If you hold a NSW builder licence, your continuing professional development is where a lot of this gets covered: contract and business practice, work health and safety, record keeping and the obligations that come with employing people.

The guide to how NSW builder CPD works explains the structure and what counts. If you are looking for courses that cover the business and compliance side rather than the trade side, the course catalogue is the place to start, and the PointCPD home page has the current enrolment information.

The point is not to collect certificates. It is that a first hire brings a set of obligations — insurance, records, supervision, information security — that most builders meet for the first time with no prior exposure. Learning them before the person starts is cheaper than learning them from a claim.

Questions builders ask

Do I need workers compensation cover for my first employee in NSW?

If you employ someone in New South Wales, you generally need a workers compensation policy that covers that employment. Cover has to be in place from the day the person starts, not arranged afterwards. Confirm the position with your insurer or workers compensation advisor before the start date and keep the confirmation on file.

What records do I have to keep once I hire someone?

You need to keep wage records, tax file declarations, superannuation records, leave records and the employment agreement, alongside the business records you already keep. The Australian Taxation Office expects business records to be kept and produced when requested, and employment records fall within that. Extending your existing bookkeeping structure is usually easier than starting a separate system.

Does hiring an employee change my public liability insurance?

It can. Your policy may have been written around the work you do personally, and adding an employee can change what the insurer needs to know, including what work they perform and whether they drive a company vehicle. Tell your insurer before the person starts and get the position confirmed in writing.

How do I work out whether I can afford a first employee?

Add up the full cost of the hire, including the wage, superannuation, insurances, vehicle, tools, phone and any additional administration, then work out what the employee needs to produce each week to cover that cost and contribute. Test that against your current rates. If the numbers do not work at your current pricing, the rates are the issue, not the hire.

What should I put in the employment agreement for a site role?

Set out the duties, the reporting line and the limits of the person’s authority, particularly around client requests and variations. An employee who agrees a price change on site without authority can create a variation you never get paid for. Also record the licences, tickets and inductions the role requires.

What should I do about cyber security when I take on my first employee?

Give each person their own account rather than a shared login, turn on multi-factor authentication for email and anything that touches money, keep devices locked and updated, and set a clear rule about how client information is stored and shared. When someone leaves, you need to be able to disable their access quickly, which only works if their access was individual.

Sources

  1. Non-conforming building products · NSW Government
  2. Record keeping for business · Australian Taxation Office
  3. Apprentices and trainees 2025: December quarter · NCVER
  4. Small business cyber security · Australian Signals Directorate

Published 30 July 2026. General information for builders, not legal, financial or engineering advice for a specific job. Check current requirements with the relevant regulator or standard before relying on them.