Induction cooktop electrical requirements for builders
Induction cooktops change the electrical load and coordination demands of a kitchen. This article explains what builders need to check and document.
12 min read
The PointCPD blog
Building industry news and articles
What is changing in Australian building, and what it means on site: construction technology, materials, energy, regulation, safety, contracts and the housing market.
Induction cooktop electrical requirements for builders
Induction cooktops change the electrical load and coordination demands of a kitchen. This article explains what builders need to check and document.
12 min read
Suspending work on an NSW residential job the right way
Suspending work is a contractual remedy, not a reaction. Get the notice right and you stop the clock without breaching the contract; get it wrong and you hand the other side a claim.
12 min read
HBCF eligibility and premiums: how an insurer assesses a builder
Eligibility for the Home Building Compensation Fund is not a form you fill in once. It is an underwriting decision about your business, and it is reviewed against the work you are actually taking on.
11 min read
Roof tile rebedding and pointing: scope, materials and common faults
Rebedding and pointing is repair work on an existing tiled roof, not a re-roof. Getting the scope, the mortar and the coating right decides whether it lasts one season or fifteen.
13 min read
Fatigue on residential builds: the WHS duty behind a long week
Fatigue gets treated as a character problem — the bloke who should have gone home earlier. Under the model WHS laws it is a hazard you manage like any other, and the levers sit mostly with the builder, not the worker.
14 min read
Managing materials price volatility in your building contracts
Materials prices can move between tender and lock-up. The contract wording and the procurement sequence decide who carries that movement — and whether it lands as a variation or as your margin.
12 min read
Connected appliances and systems at handover: what to give the owner
A connected house is only as good as the information you leave behind. Handover for smart systems is a documentation obligation, and the defects that surface later usually trace back to something nobody wrote down.
11 min read
EV charger rough-in: planning the circuit and the load before the plaster goes on
The cheapest time to work out where an EV charger goes, and whether the supply can carry it, is before the walls are sheeted. Retro-fitting the circuit later costs more, and often ends in a switchboard upgrade that was avoidable at design stage.
11 min read
When a homeowner refuses to pay: options for NSW builders
A homeowner withholding payment is a cashflow problem before it is a legal one. The order you escalate in decides how much of the debt you actually recover.
11 min read
Which insurance cover a building business actually needs
Most builders carry insurance because a contract demands it, not because they have matched the cover to the work they actually do. This is the cover checklist to run against your business.
11 min read
Metal roof flashing details that cause leaks
Most metal roof leaks are not product failures. They are sequencing and lap-direction failures that are sealed over before anyone can see them.
13 min read
Heat illness prevention on NSW sites: rostering, water and shade as management controls
Heat illness is a management problem before it is a medical one. The controls that hold up are the ones you build into the programme, the site layout and the supervision routine before the first hot week.
13 min read
Reading housing supply and demand indicators on the ground
Supply and demand indicators only matter when they change what you do next. Here is how to read the signals that reach a residential builder, and how to turn them into decisions about pipeline, pricing and labour.
10 min read
Free site templates for builders
SWMS, JSA, Take 5, inspection checklists, site diary, variations and payment claims. Word and PDF, free for commercial use.