Recycled content building products: compliance and warranty risk on NSW sites
Recycled content changes nothing about a product’s legal obligations — but it often changes the evidence trail. Here is how to keep compliance and warranty cover intact.
10 min read
The PointCPD blog
Building industry news and articles
What is changing in Australian building, and what it means on site: construction technology, materials, energy, regulation, safety, contracts and the housing market.
Recycled content building products: compliance and warranty risk on NSW sites
Recycled content changes nothing about a product’s legal obligations — but it often changes the evidence trail. Here is how to keep compliance and warranty cover intact.
10 min read
Practical completion and handover: a builder’s checklist for finishing a job properly
Handover is where a good job becomes a good reputation, or where a dispute begins. The completion date starts the statutory warranty periods, the final payment depends on it, and the owner’s first impression is formed in the first hour. Here is how to finish properly.
7 min read
The most common building defects in NSW, and how builders stop them happening
Building Commission NSW’s research and audits point to the same culprits year after year: waterproofing first, fire safety second, then structure, the building enclosure and services. Here is where defects come from, and the site controls that stop them.
7 min read
Home building compensation: when it is required on NSW residential work and when it is not
Home building compensation sits outside the claims process: it is a licensing condition on most residential work over the threshold. Getting the trigger wrong exposes you to penalties, a stop-work order and a contract the homeowner can walk away from.
11 min read
Construction technology in 2026: what is real for residential builders, and what is still hype
Every year brings a new wave of construction technology promises. Some tools are now everyday essentials for small builders; others are real but suit only certain jobs; a few are still more demonstration than delivery. Here is our honest sorting for 2026.
7 min read
Master Builders says Housing Accord is 88,800 homes behind as new modelling points to 10,700 fewer homes
Master Builders Australia says the 1.2 million homes target is already 88,800 homes behind, and that updated modelling now shows Budget housing policies cutting supply by 10,700 homes over four years after the deal restricting SMSF investment.
5 min read
Retention and defects liability periods on home jobs in NSW
Retention is money held back to give a principal leverage over defects and incomplete work; the defects liability period sets how long that leverage lasts. They are separate from the statutory warranties that survive both, and getting the wording wrong is expensive.
14 min read
Construction site security: cameras, tool tracking and the basics that stop theft
Tools, appliances, copper and plant go missing from building sites every week, and the loss is more than the replacement cost. Here is how to layer site security, which technology is worth it, and the NSW surveillance rules to follow.
8 min read
Occupation certificates in NSW: what builders need to have ready for the final inspection
The occupation certificate is the last step in the approval process and often the first thing a client and their lender ask for. Delays usually come from missing paperwork, not failed work. Here is what the certifier needs and how to be ready.
7 min read
Plasterboard fixing and jointing defects at handover: prevention on the tools
Almost every plasterboard defect a certifier or client picks up at handover was set on the day the sheets went up and the joints were taped. This article deals with fixing and jointing practice rather than lining selection.
11 min read
Metal roof vs tile roof: a builder’s comparison of weight, heat, noise, fire, coast and cost
The metal-or-tile decision is usually made on looks and price. For builders, it is also a structural, thermal, acoustic and durability decision that changes the frame, the tie-down, the sarking and the details. Here is how the two compare.
7 min read
NSW pool barrier rules: what builders and renovators need to get right before summer
Pool barriers are one of the few building elements where a small defect can cost a child’s life. With pool season approaching, here is what NSW law requires, which standard applies, and the renovation trap that catches builders out.
7 min read
Working near overhead powerlines: safe approach distances and load movement
Overhead line contact is one of the few site hazards that can kill the operator and the spotter in the same moment. The control is planned load movement, not vigilance.
11 min read
Free site templates for builders
SWMS, JSA, Take 5, inspection checklists, site diary, variations and payment claims. Word and PDF, free for commercial use.